Connect with us

Latest News

Golden Jackals Spotted Near DPS Lake, Nerul: Fresh Call to Protect Ecologically Sensitive Zone

Published

on

A recent sighting of golden jackals behind DPS Lake in Sector 52A, Nerul, has reignited calls from environmentalists and local citizens to protect the ecologically sensitive area. Wildlife enthusiast Ashutosh Kelkar captured the sighting, drawing renewed public attention to the region’s rich biodiversity.

The DPS Lake area, surrounded by mangroves and part of a vital wildlife corridor near the NRI wetland, has been under scrutiny due to ongoing development pressures. Golden jackals, known to thrive in mangrove ecosystems, have been regularly spotted in the area, underscoring its ecological significance.

Environmentalists argue that the lake and surrounding green patches are essential urban habitats and should be designated as protected forest land. “CIDCO had earlier marked the DPS Lake plot as developable land, despite the revised Development Plan awaiting state approval,” said activist Sunil Agarwal. Allegations have also surfaced against a private builder for illegally cutting over 300 trees without permission or formal possession of the plot.

In response to growing public concern, Maharashtra Forest Minister Ganesh Naik has reportedly instructed CIDCO to immediately halt all development activities on the site. Naik has also asked the Forest Department to explore declaring the area a Conservation Reserve, which would ensure long-term ecological safeguarding.

Activists emphasize that the plot’s close proximity to mangroves makes it a critical part of Navi Mumbai’s coastal ecosystem. “The sighting of golden jackals confirms this is not just green space—it’s an active urban forest,” Agarwal stressed.

Continue Reading
Advertisement
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Latest News

40,000 NMMC School Students Await Uniforms as Contractor Misses Deadline

Published

on

Navi Mumbai civic body extends delivery deadline to August 15 for Mafatlal Industries, imposing week-by-week financial penalties.

The Deadline

Over 40,000 primary and secondary students enrolled in Navi Mumbai Municipal Corporation (NMMC) civic schools remain without their new uniforms, following significant delays by the designated contractor.

The civic body had awarded a Rs 13.33 crore contract to M/s Mafatlal Industries Limited to supply regular, sports, and Scout/Guide uniforms to 50,550 students ranging from Balwadi to Class 10. Despite receiving the work order on May 8 with a strict delivery deadline of July 15, the contractor managed to supply complete sets to only around 8,000 students by the target date. As a result, thousands of children are currently forced to attend classes in old uniforms or home clothes.

Following show-cause notices issued on July 10 and July 21, the civic administration granted an official extension until August 15. However, the delay comes with financial consequences for the supplier. In accordance with contract terms, NMMC will deduct progressive penalties from the final payment ranging from 0.5% for the first week of delay up to 2.0% for subsequent weeks.

NMMC Deputy Education Commissioner Sanghratna Khillare confirmed that the decision to extend the deadline was taken after high-level discussions with civic authorities, emphasizing that penalty deductions will be strictly enforced as per municipal rules to ensure full delivery before mid-August.

Continue Reading

Latest News

Deep Potholes Turn Kharghar Stretch into Hazardous Accident Zone

Published

on

Frustrated residents call out PCMC inaction as hidden craters under waterlogged roads trigger collisions and severe commuter delay.

The Potholes

Growing public outrage has erupted across Kharghar as deep, crater-like potholes and poor drainage have converted key internal corridors into severe accident hazards. Monsoon rains have left several vital stretches particularly those serving Sectors 2 through 36 and connecting high-footfall destinations like Central Park, ISKCON Temple, and the Tata Memorial/ACTREC facility in a state of absolute disrepair.

Submerged under rainwater, the hidden potholes pose an invisible trap for two-wheeler riders and daily commuters. Frequent incidents of motorists skidding, losing balance, and crashing into deep depressions have been reported. The situation is further compounded by heavy commercial vehicles making sudden, erratic maneuvers to dodge the craters, causing minor rear-end collisions and massive traffic bottlenecks during peak commuting hours.

Local residents and civic activists have strongly criticized the Panvel City Municipal Corporation (PCMC) for its inaction. Frustrated tax-paying citizens point out that recurring temporary patch-ups dissolve within weeks of heavy downpours, reflecting a lack of quality control in municipal road maintenance contracts.

Demanding immediate accountability, community members have urged civic authorities to deploy emergency road repair teams, clear clogged storm-water drains, and execute comprehensive quality audits on recent infrastructure works before major casualties occur.

Continue Reading

Latest News

Pothole-Riddled Highways Threaten Commuters and Airport Route in Navi Mumbai

Published

on

Despite millions spent on annual maintenance, heavy rains expose crumbling infrastructure across major arteries like Sion-Panvel and Ulwe-Belapur roads.

The Potholes

A wave of public anger has erupted across Navi Mumbai as relentless monsoon rains have turned major highways into dangerous, pothole-riddled stretches. Key routes connecting Mumbai, Thane, Raigad, and the JNPA port are seeing severe traffic bottlenecks and frequent accidents.

The situation is particularly critical along the Ulwe-Belapur road, the primary arterial route for the Navi Mumbai International Airport. Deep craters and heavy waterlogging have made travel hazardous for both domestic and international commuters. The safety risks were highlighted recently when a heavy container truck overturned on the Ulwe-Belapur stretch, causing massive gridlock on both sides of the corridor.

Other vital thoroughfares, including the Sion-Panvel Highway and the Thane-Belapur road, are equally affected. Key flyovers at Kharghar and Turbhe, along with the main entry stretch from Airoli Toll Plaza, have developed large, hidden craters beneath accumulated rainwater. Daily commuters and two-wheeler riders face constant hazards as vehicles lose balance during sudden braking.

Frustrated residents have raised sharp questions over civic accountability, noting that temporary patch-ups wash away annually despite substantial maintenance budgets. Addressing the mounting criticism, National Highways Authority of India (NHAI) officials stated that repair work is currently underway on a war footing, promising long-term, modern road infrastructure upgrades to match the international airport’s requirements.

Continue Reading

Trending