Connect with us

Latest News

After a brief disruption, NMMT’s Bus Tracker Service with ITMS is back operational

Published

on

NMMT’s Bus Tracker Service with ITMS was back in operation after being disrupted for a while.

The Service

Commuters who had been inconvenienced since last Tuesday due to a temporary suspension of the service during server shifting work are now at ease as the much anticipated return of the Navi Mumbai Municipal Transport’s (NMMT) Bus Tracker Service with Intelligent Transportation Management System (ITMS) is back in service.

For many years, a crucial element in effectively overseeing the city’s bus services has been the ITMS-supported Bus Tracker Service. But due to a recent outage in service, travelers were unable to get real-time bus timetable information, which forced them to use alternate forms of transportation.

The enterprise suffered financial losses as a result of the service interruption, which also caused a drop in passengers. In addition, the administration’s delayed notification of the expected length of the service disruption drew criticism. In response to the public’s anger, the government finally released a statement promising a prompt restoration of service. Though the public’s commute was further inconvenienced, it was later found that the service was not operational until Friday night, despite the first commitment.

But now that the server shift has ended, reports indicate that the Bus Tracker Service with ITMS is operating even more efficiently than it was previously. Important data, like the closest bus stop to their location, the distance to the stop, and the approximate walking time, is now again available to commuters. The system offers information on available bus numbers, their timetables, and real-time tracking of their present positions once the passenger arrives at the bus stop.

Continue Reading
Advertisement
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Latest News

NMMC Warns Developers of Strict Action for Violating Construction Pollution Norms

Published

on

Civic body directs builders to follow dust and noise pollution guidelines; violations may attract penalties and other legal action.

The Warning

The Navi Mumbai Municipal Corporation (NMMC) has warned developers and architects across the city of strict action for violating pollution-control guidelines at construction sites. The civic body has directed builders to implement all prescribed measures to control dust and noise pollution.

The instructions were reiterated during a special meeting organised by Assistant Director of Town Planning Somnath Kekaan, following directions from Municipal Commissioner Dr Kailas Shinde. As per the guidelines, construction sites must install barricades at least 30 feet high and cover buildings with green safety nets to prevent dust from spreading. Developers have also been instructed to install fogging machines, water sprinklers, digital Air Quality Index (AQI) monitoring systems and CCTV cameras.

Maintaining cleanliness on adjoining roads and footpaths has also been made mandatory to prevent dust accumulation. The civic administration has further raised concerns over noise pollution caused by excavation and basement construction work. Developers have been instructed to carry out such activities only during permitted hours to minimise inconvenience to nearby residents.

These measures follow directions issued by the Bombay High Court in a suo motu public interest litigation concerning dust pollution in Mumbai and the Mumbai Metropolitan Region. NMMC has made it clear that developers and architects will be held responsible for implementing pollution-control measures, and strict action will be taken against those found violating the norms.

Continue Reading

Latest News

Formula 4 Racing Preparations Disrupt Daily Life in Nerul and Seawoods

Published

on

Road closures and traffic restrictions inconvenience residents; questions raised over event expenditure and lack of public consultation.

The Race

Preparations for the Formula 4 racing event scheduled for December 5 and 6 in Navi Mumbai have caused inconvenience to residents of Nerul and Seawoods due to road closures, traffic restrictions and changes in access routes.

The racing track is being developed along Palm Beach Road and parts of Nerul and Seawoods, near Jewels of Navi Mumbai. Residents have complained that construction activities have narrowed roads, affected pedestrian movement and disrupted access to residential areas.

Residents have also expressed concern over the lack of clear communication regarding road closure timings, traffic diversions and alternative routes. They alleged that their suggestions were not considered before implementing the restrictions. The preparations have reportedly affected local events, with some wedding functions at Ganpat Sheth Tandel Ground and programmes at the exhibition ground being cancelled. Local sportspersons have also faced difficulties due to the racing track passing through a ground in Sector 24.

The event’s expenditure has also drawn criticism. According to reports, the Navi Mumbai Municipal Corporation (NMMC) has spent over Rs 40 crore on the event, while the expected revenue is around Rs 10 crore. Uddhav Sena deputy city chief Sameer Bagwan has demanded greater transparency from NMMC and called for the agreement with the event organisers to be presented before the general body. Residents have urged the authorities to address their concerns and ensure minimum disruption to daily life.

Continue Reading

Latest News

NMMC Announces 12-Hour Water Cut Across Navi Mumbai on November 27

Published

on

Maintenance work and installation of flow meters to disrupt supply across major nodes; residents advised to store water in advance.

The Water Cut

The Navi Mumbai Municipal Corporation (NMMC) has announced a 12-hour water supply shutdown on Friday, November 27, to carry out maintenance work and install new flow meters and valves across its water distribution network.

The shutdown will remain in effect from 10 am to 10 pm and will affect Belapur, Nerul, Vashi, Turbhe, Sanpada, Koparkhairane, Ghansoli and Airoli. Areas of Kharghar and Kamothe under CIDCO will also experience a water supply disruption. The maintenance work will include installing flow meters and valves at various locations along the main water pipeline stretching from Belapur to Airoli. Similar work will also be undertaken at Elevated Service Reservoirs (ESRs) and Ground Service Reservoirs (GSRs).

Due to the shutdown, residents will not receive water on Friday evening. On Saturday, November 28, water supply during both morning and evening hours is expected to be restored at reduced pressure. The civic administration has appealed to residents of the affected areas to store sufficient water in advance and use it carefully until normal supply is restored.

Continue Reading

Trending