Latest News
Residents of Ghansoli urge for of a swimming pool
The Central Park Garden in sector 3, Ghansoli, has a swimming pool, and locals and sports fans have sought its opening. A restoration of the swimming pool has also been advised by the sports department of Navi Mumbai Municipal Corporation (NMMC). Since its creation, the 25-meter-wide, 50-meter-long swimming pool located inside the Central Park Garden has never been exposed to the public. 35,000 square meters make up the garden, and construction was finished in 2015–2019.
Among its features are a little football field, a roller skating track, gardens, a temple, a sports area, and an interior driveway of six meters in width. In 2020, the garden was temporarily open before closing as a result of the Covid epidemic. The garden is now open from 5 p.m. to 9 p.m. and from 6 a.m. to 10 a.m. “The swimming pool could not be opened to the public even though it was filled with water after construction,” an NMMC horticulture staff member stated. There have been complaints from locals regarding mosquito breeding. The water in the swimming pool needed to be drained out. The swimming pool’s tiles and concrete structure were later harmed by exposure to environmental elements, but they haven’t been fixed since.
According to Rohidas Thorat, a local, “many people coming up to the garden found the swimming pool is closed and fenced.” Therefore, we urge that it be opened. The aspiring athletes will gain from this. “The sporting area users are charged a nominal fee,” stated Revappa Gurav, the NMMC sports officer. During the weekends, between 2000 and 3000 locals visit. Investigating the swimming pool problem is the engineering department. According to an NMMC engineering representative, “The swimming pool is undergoing repairs and corrective actions as recommended by the sports department.” Other suggestions include toilet block areas and barricades. Under the direction and supervision of a sports specialist, work estimated to be worth around Rs 55 lakh is anticipated to be finished by December of this year.
Latest News
40,000 NMMC School Students Await Uniforms as Contractor Misses Deadline
Navi Mumbai civic body extends delivery deadline to August 15 for Mafatlal Industries, imposing week-by-week financial penalties.
The Deadline
Over 40,000 primary and secondary students enrolled in Navi Mumbai Municipal Corporation (NMMC) civic schools remain without their new uniforms, following significant delays by the designated contractor.
The civic body had awarded a Rs 13.33 crore contract to M/s Mafatlal Industries Limited to supply regular, sports, and Scout/Guide uniforms to 50,550 students ranging from Balwadi to Class 10. Despite receiving the work order on May 8 with a strict delivery deadline of July 15, the contractor managed to supply complete sets to only around 8,000 students by the target date. As a result, thousands of children are currently forced to attend classes in old uniforms or home clothes.
Following show-cause notices issued on July 10 and July 21, the civic administration granted an official extension until August 15. However, the delay comes with financial consequences for the supplier. In accordance with contract terms, NMMC will deduct progressive penalties from the final payment ranging from 0.5% for the first week of delay up to 2.0% for subsequent weeks.
NMMC Deputy Education Commissioner Sanghratna Khillare confirmed that the decision to extend the deadline was taken after high-level discussions with civic authorities, emphasizing that penalty deductions will be strictly enforced as per municipal rules to ensure full delivery before mid-August.
Latest News
Deep Potholes Turn Kharghar Stretch into Hazardous Accident Zone
Frustrated residents call out PCMC inaction as hidden craters under waterlogged roads trigger collisions and severe commuter delay.
The Potholes
Growing public outrage has erupted across Kharghar as deep, crater-like potholes and poor drainage have converted key internal corridors into severe accident hazards. Monsoon rains have left several vital stretches particularly those serving Sectors 2 through 36 and connecting high-footfall destinations like Central Park, ISKCON Temple, and the Tata Memorial/ACTREC facility in a state of absolute disrepair.
Submerged under rainwater, the hidden potholes pose an invisible trap for two-wheeler riders and daily commuters. Frequent incidents of motorists skidding, losing balance, and crashing into deep depressions have been reported. The situation is further compounded by heavy commercial vehicles making sudden, erratic maneuvers to dodge the craters, causing minor rear-end collisions and massive traffic bottlenecks during peak commuting hours.
Local residents and civic activists have strongly criticized the Panvel City Municipal Corporation (PCMC) for its inaction. Frustrated tax-paying citizens point out that recurring temporary patch-ups dissolve within weeks of heavy downpours, reflecting a lack of quality control in municipal road maintenance contracts.
Demanding immediate accountability, community members have urged civic authorities to deploy emergency road repair teams, clear clogged storm-water drains, and execute comprehensive quality audits on recent infrastructure works before major casualties occur.
Latest News
Pothole-Riddled Highways Threaten Commuters and Airport Route in Navi Mumbai
Despite millions spent on annual maintenance, heavy rains expose crumbling infrastructure across major arteries like Sion-Panvel and Ulwe-Belapur roads.
The Potholes
A wave of public anger has erupted across Navi Mumbai as relentless monsoon rains have turned major highways into dangerous, pothole-riddled stretches. Key routes connecting Mumbai, Thane, Raigad, and the JNPA port are seeing severe traffic bottlenecks and frequent accidents.
The situation is particularly critical along the Ulwe-Belapur road, the primary arterial route for the Navi Mumbai International Airport. Deep craters and heavy waterlogging have made travel hazardous for both domestic and international commuters. The safety risks were highlighted recently when a heavy container truck overturned on the Ulwe-Belapur stretch, causing massive gridlock on both sides of the corridor.
Other vital thoroughfares, including the Sion-Panvel Highway and the Thane-Belapur road, are equally affected. Key flyovers at Kharghar and Turbhe, along with the main entry stretch from Airoli Toll Plaza, have developed large, hidden craters beneath accumulated rainwater. Daily commuters and two-wheeler riders face constant hazards as vehicles lose balance during sudden braking.
Frustrated residents have raised sharp questions over civic accountability, noting that temporary patch-ups wash away annually despite substantial maintenance budgets. Addressing the mounting criticism, National Highways Authority of India (NHAI) officials stated that repair work is currently underway on a war footing, promising long-term, modern road infrastructure upgrades to match the international airport’s requirements.
-
Fact Check6 years agoNidhi Razdan, fake Harvard professorship, and here is the explanation through her blog.
-
India4 years agoAs the arrangement with Prashant Kishor falls through Rahul Gandhi has gone overseas again and is uncontactable
-
Technology5 years agoBSNL reveals all new 4G plans starting at ₹16
-
Latest News5 years agoGovernment has spent ₹9,725 crores on Covid-19 vaccination drive so far
-
Latest News5 years agoTata wins Air India with ₹18,000 crore bid
-
Latest News5 years agoJharkhand government cuts Petrol price by massive ₹25 a litre but with a catch
-
Latest News5 years agoRaj Kundra Gave ₹25 Lakh Bribe to Mumbai Crime Branch to Avoid Arrest
-
Navi Mumbai5 years agoNavi Mumbai civic body raids and tests morning walkers, many found COVID positive
