Connect with us

Latest News

Russia seems unable to manufacture tanks due to financial hardship : Ukrainian intelligence

Published

on

The sanctions placed by Western countries continue to put Russia in a tough position. According to Ukrainian intelligence, Russia’s tank manufacturing has ceased owing to budgetary difficulties. It goes on to say that Uralvagonzavod, a Russian machine-building enterprise based in Nizhny Tagil, is working to remedy the issue brought on by Western sanctions. Despite Russia’s continued aggression toward Ukraine, the Russian Federation cannot continue to manufacture high-tech weaponry without foreign components.

Russia has also delayed the manufacturing of new weaponry, notably the “T-90” and “T-14” Armata tanks, according to Ukrainian intelligence. According to the report, the facility’s priority has moved to repair military equipment that has been destroyed during the conflict with Ukraine. According to local media, Moscow has constructed an operating centre whose primary objective is to repair military equipment that has been damaged during the conflict with Ukraine. Growing interest rates on loans, a shortage of funds to settle foreign-currency obligations, and rising prices for materials and components, notably armoured steel, all contribute to Russia’s issues, according to the information.

A similar assertion is made by Washington. In a speech at the end of March, Thea Kendler, an assistant secretary for export administration at the Ministry of Trade, reported that Uralvagonzavod, a Russian machine-building business, was experiencing difficulties in its operations. According to the Bulgarian Military, the manufacture of the new Russian T-14 Armata tank was not proceeding as planned even before the conflict, and the major reason was a lack of funding.

Another setback for Uralvagonzavod.

Uralvagonzavod experienced yet another setback, this time from the court in Moscow rather than the west, as it faced issues with the manufacture of heavy armoured military equipment. A Moscow-based company, Promtransinvest AD, bought 222 Uralvagonzavod railway vehicles a year ago, but an assessment revealed that all 222 waggons had faulty traction systems. The buyer chose to fix the problem himself, for $161,000 and then launched a lawsuit in a Moscow court. Promtransinvest AD won in court, and Uralvagonzavod was ordered to compensate Promtransinvest AD for the money spent on repairs.

Continue Reading
Advertisement
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Latest News

Navi Mumbai Man Arrested for Allegedly Killing Acquaintance Over Unpaid Mobile Loan EMIs

Published

on

The accused allegedly stabbed his 23-year-old acquaintance to death following a dispute over unpaid mobile phone instalments and dumped his body near Shivkar village.

The Unpaid Loan

A 30-year-old man has been arrested by Panvel City Police for allegedly murdering his 23-year-old acquaintance over unpaid mobile phone loan instalments in Navi Mumbai.

The accused, identified as Pratik Mohan Jadhav, allegedly killed Pratik Dilip Ambawale, a resident of Kopri in Thane, following a dispute over loan repayments. According to police, Ambawale had purchased two mobile phones on loan, with Jadhav acting as the guarantor. However, Ambawale allegedly failed to pay the instalments, following which recovery agents repeatedly contacted Jadhav.

On November 8, the two met near Panvel railway station and later travelled to Shivkar village. During their meeting, an argument reportedly broke out over the unpaid instalments and recovery calls. Jadhav allegedly stabbed Ambawale to death and dumped his body in bushes near a drain. The accused also allegedly disposed of the blood-stained weapon and the victim’s bag to destroy evidence.

Ambawale’s family filed a missing person complaint on November 9. During the investigation, police examined mobile phone locations and call records, which helped them identify Jadhav. The police recovered the victim’s body and arrested the accused on November 16. A case has been registered for murder and destruction of evidence. Further investigation is underway.

Continue Reading

Latest News

Navi Mumbai May Face Water Cuts as Morbe Dam Storage Drops to 60.90%

Published

on

NMMC considers weekly water cuts or reduced supply hours as dam levels decline; residents urged to conserve water.

The Water Cut

Navi Mumbai may soon face water cuts as the water storage level at Morbe Dam continues to decline. The Navi Mumbai Municipal Corporation (NMMC) is considering various measures to ensure sufficient water supply until the next monsoon.

As of November 17, the usable water storage in Morbe Dam had dropped to 60.90%, compared to 90.83% during the same period last year. The dam’s water level stood at 83.30 metres against its maximum capacity of 88 metres. The civic administration is considering two options: stopping water supply for one full day every week or reducing the frequency of supply from twice to once a day in areas that currently receive water twice daily. However, no final decision has been taken yet.

NMMC is also planning to reduce daily water extraction from Morbe Dam from approximately 480 million litres per day (MLD) to 400 MLD, saving around 80 MLD. Meanwhile, CIDCO has already implemented a 15% water cut in its areas, while the Thane Municipal Corporation has imposed a 10% reduction.

NMMC Water Supply Committee Chairman Ravikant Patil said a meeting with the water supply department would be held within the next two to three days to review the situation and decide on further measures. The civic administration has appealed to residents to use water responsibly and avoid unnecessary wastage.

Continue Reading

Latest News

Shapoorji Pallonji Booked Over Illegal Soil Dumping in Juinagar

Published

on

Navi Mumbai Revenue Department files police complaint after developer allegedly fails to pay Rs 8.30 crore penalty for unauthorised dumping of soil and gravel.

The Illegal Dumping

The Navi Mumbai Revenue Department has filed a police complaint against developer Shapoorji Pallonji over alleged illegal dumping of soil and gravel near Juinagar railway station. The action was taken after the company allegedly failed to pay a penalty of Rs 8.30 crore imposed by the authorities.

According to the revenue department, the illegal dumping took place in November 2018 on two plots in Sectors 10 and 11 of Juinagar, near Sonkhar. An investigation revealed that approximately 7,949 brass of minor minerals, including soil and gravel, had been dumped without the required government permission.

The Thane Tehsildar’s office issued several notices to the developer between 2018 and 2023. On January 18, 2024, the authorities imposed a penalty of Rs 8.30 crore and directed the company to pay the amount within 15 days. However, the amount remained unpaid. In April 2025, the department issued a property seizure notice. Later, on February 27, 2026, officials sealed a sample flat in the project’s building as part of the recovery process.

Following approval from the Tehsildar’s office, a criminal complaint was filed at Sanpada Police Station on November 18, 2026. The case has been registered under various laws related to land revenue, mining, environmental protection and damage to public property. Sanpada Police are conducting further investigation.

Continue Reading

Trending